Universal LENR Reactor – Auto Pilot System
| September 26, 2012 | Posted by admin under Dale Basgall, Universal LENR Reactor |
Dale Basgall has been hard at work to finish up the design for the Universal LENR Reactor. He has indicated that this may be the final presentation on the design and will be working on finishing up with his patent application. In the meantime, we hope that scientists may utilize his insights and designs to build a standard reactor for conducting LENR experiments. Mr. Basgall has put a great deal of time and work into producing these designs, and it is the outcome of a collaboration with a group of several very talented and experienced people. Again, comments and feedback are encouraged. You may also contact him directly via the email address listed on his website. Mr. Basgall left the following comment about this presentation:
I have completed the pinouts on the Auto Pilot Logic Controller that will operate the Reactor as well as monitor all functions for documenting and progressing the LENR experiment. The auto pilot situation is for experiments that may take longer than a few hours and that could possibly extend into days.
The point being, when logic is applied to the LENR field there gets to be many variables to calculate and decode. The problem is that when no theory is present yet that is proven not to be false or that assists assigning control to the logic portion, it is difficult to assign outputs and inputs. Not a problem to monitor at all. Just a guessing game at this point, for instance what makes the reactions start, “exactly” not trial and error, you don’t even know your making an error.
I heat up the fuel and it expands to a Barr that enables the logic to monitor functions, the oscillator for the glow plug is energized and heat is building in the reactor heater chamber as well as the coolant surrounding the core holder. I then start my high volatage oscillator system and get it firing at a frequency selected to start and again a guessing game and depending what fuel is used, which way the reactor is facing, and so on, you see where I am going with this one here. Heat is building from the IR heater which needs it’s voltage and current monitored, as well as the power amplifier voltage current and firing frequency. The temp meter sais 212 and enough heat for the first cup of coffee, nice could even heat a bagle also to begin the experiment.
Now I need the coolant temp not to exceed a certain temp and obviously the heat is the driven element here. Every control device is to result in heat gain. Now we need power, AC heat and water are not as safe by far as DC.
We need to monitor nominal volts and amps of the power system and also a charge rate indicator for the returning electrical dc current to replentish the used current in starting the experiment. The reactor gauss may be low but should be monitored as well as inducing an oscillating magnetic field in attempts to assist and progress a reaction. Acoustical stimulation x,y,z needs frequency meters and so on.
I have prepared the Auto Pilot power point however in the process had a major meltdown with my computer running the drafting package Auto Cad. I will send it as is to keep the information moving. We are almost to the end of this power point series and thanks to admin in support of the work produced. This is a clean site and well done and sometimes I wonder about how many people really care about the technical aspects of new things.
I care! Admirably detailed work. I added it to LENR CONNECT
http://lenrconnect.com/xn/detail/6536556:Comment:2547
…which has nothing on what you’re doing here.
Well, let’s say we’ve got a ways to go…
Yes it does appear that way for sure, in the beginning when we were told a product was ready time lapsed into the current date with still nothing presented in product form.
One thing for sure though, the Italians (Rossi – Defkalion) have a strange way of doing business. Almost like they were rookies and got excited. Seems like Rossi had a good sales pitch and Defkalion ran with it. I wouldn’t want to get caught up in that mess with those two.
LENR to me is like a wide deep river and flowing in that river is red thick mud a little less thick than a bread dough just enough for it to flow at a steady rate. You cannot see one millimeter under the surface of the flowing mud but need to get across within a specific amount of time, if you don’t you will be pushed in and immediately get swallowed up in the mud river never to be seen again.
You have been given a hint that there is a one foot wide cement pathway extending across the river less that a foot below the surface of the flowing mud which means you find that hidden from sight cement pathway, and you cross and live.
You have one stick just long enough to poke into the mud at different intervals to “just touch” the surface of the pathway under the mud. You also know that the pathway crosses somewhere within a one mile area in length possibly a little farther and time is ticking.
So where do you start poking in the stick? At one end or the other or in the middle, time is ticking and it’s a for sure death if you don’t find the pathway in time.
This is where we are in LENR today, if there were no claims made by Rossi or Defkalion over a year ago that products were being used and that the e-cat 10kw was a turn key product the timeline wouldn’t be critical for one (which is very important to discoveries) and next of all and compared to the above scenario of the mud river we would have no imposed time limit or expectations to “discover” where the pathay actually was under that flowing mud.
There is a real situation here and now where it seems energy costs are consuming cash from customers for heating and electricity at a rate it is becoming obviusly very important for our well being that we find other solutions sooner than later. Unfortunately people do not seem to care unless it hurts them, that’s sad but factual based on observation.
So we do have a timeline to keep, we either get it done now or in a few years we will be paying the high price of thermal or electrical energy in ways we never thought of as humans. So we are in muddied waters right now with LENR claims, the river is running. We have multiplied to a number that is unbalanced in mathematics, “a very fragile cord we are swinging on right now”. LENR and other solutions could be discovered by the mass of people working together for our survival and our childrens. The balance will be tipped by people and to me it appears like a bank account with checking to me.
It is obvious that if a person writes checks from an account with insufficient funds and get’s in trouble that most likely they have not got the means or wherewithall to make up and keep the account balanced. Like people here and now, we have contributed to the energy demands, every one of us. We are in a grave energy crisis with the fighting over the oil which is another issue initself.We are in this energy situation because of how we live and what we demand in comfort. Does anyone find any logic for us to “make it better” until our hands are forced and pain is felt by the mass population. That’s sad but the facts remain as evidence now.
LENR could be brought forward there is no doubt at all of it’s reality. All it would take is changing human character first to a more humble civilization.
Jim it just takes that one person who cares to satisfy an inventor, after all inventing is like drawing a picture but using metal and other things, so the success for the inventor is alot like an artist, seeing the work where others can see it. So I have always believed that competition in industry is the greatest thing a customer has on his or her side. The only people who get upset about others attempting to improve their art are the people who walk in uncertainty that what they have has been reduced to practice.
It is easy to improve a virgin product, but difficult to change one like in examlple the reactor discussed here, the “Universal Reactor”. As soon as serious people begin to pick this apart they will realize why it took 154 drawings and since February 2012 to complete this design. Looks simple and no big deal but when fully studied the manufacturers will be scratching their heads knowing there is a slim opportunity to come up with a newly designed reactor with the same features that can be built for less cost to produce, and in fact the prices I have set will be goals to hit for manufacturing costs. I did not want this to cost over a few hundred bucks back when we started this product design but the rest of the team thought it would be a couple grand to experiment and needless to say this got complicated with so many variables that could cause a fluctuation termination of LENR.
So pick that reactor apart and use it, after all that’s what applying for a patent is all about, giving information to the every day person so they can make one and use it for themselves. What is not right in any viewpoint is when a company or CEO decides they want something and then makes it and sells it and then produces information that makes it look like they thought of it and now have the rights to capitalize. But at that level it’s a drama ladder.
So after 30+ years of patenting products I know what doesn’t work for the inventor. Mr. Rossi has exhibited that as well as Defkalion. Watch this unfold in the future where Mr. Rossi and Defkalion will be back burner distributors of the products they pioneered simply due to their secrecy.